311th Engineering Battalion

In July 1943, the battalion was sent the Denison Dam area to demolish 14 bridges which in the new lake backwash area. The bridges were down within 8 hours after their arrival. 1

Sources

1 – Briggs, Richard A. (1954). Black Hawks Over the Danube: The History of the 86th Infantry Division in World War II. Independently published.